- Lab upgrades for laser table, darkroom, gas cabinet, fume hoods, lab benches, and sinks
- Prime consultant: 360 Engineering provided mechanical and plumbing engineering and coordinated all design disciplines
- Existing system assessment: reviewed mechanical equipment, balancing reports, and hazardous exhaust capacity for new fume hoods
- Mechanical upgrades: specified new fume hoods, adjusted airflow and pressurization, coordinated darkroom laser table and curtain placement with architect and lab users
- Plumbing upgrades: new lab sinks, gas and compressed air services for fume hoods, and safety shutoff to stop gas flow when needed
- Challenges addressed: reused existing ductwork where possible and coordinated new systems around existing walls and structures