Denver Public Schools Fallis Elementary

Location: Denver, CO

Owner: Denver Public Schools

Client: Denver Public Schools

  • 53,000 SF school retrofit to improve ventilation and add air conditioning, led by 360 Engineering as the Prime Consultant 
  • Assessment of complex legacy systems: mezzanine Air Handling Units (AHUs), unit ventilators, and terminal boxes 
  • Mechanical system strategy shift from mezzanine AHUs to rooftop units for efficiency and maintenance access 
  • Packaged heat pump Rooftop Units (RTUs) with energy recovery and gas backup aligned with DPS electrification and GHG reduction goals 
  • Cost and vendor coordination during Design Development to evaluate RTU options 
  • RTU placement optimized to minimize structural impacts and construction cost 
  • Electrical and utility coordination with DPS, Xcel Energy, electrical engineers, and CMGC to replace switchgear and address equipment lead times 